:: Our previous achievments (Bridge project)
               
         
     
Item
Project
Borehole
Site and Project
Date
1   Bridge Project
 31holes

 Bridge along National Road   5, Bridge Killo6 toTaki,  Battembang.

7/2000
2   Bridge Project
 10 holes

 Five Bridges, National Road   6, 17Km from Siem Reap to  Angrong.

7/2000
3   Bridge Project
 9 holes

 National Nº2 from Takeo Town to Viet  Nam Border.

5/2002
4

  Bridge Project

 9 holes

 National Road No 1 from Phnom  Penh to Neak Leung

5/2002
5

  Bridge Project

 3 holes
 Apsara bridge, Siem Reap  province
1/2004
6   Road
 38 Points

  National Road Nº 51

6/2002
7   Bridge Project  3 holes  Bridge Preah Konlong, Kandal  province
7/2002
8   Bridge Project  8 holes  Improvement National Road Nº1
6/2004
9   Bridge Project  15 holes  Improvement National Road No2
04/2004
10 Cambodia Road
Improvement
 91 holes  Cambodia-road Improvement,  6E, 6F, 56, 68
11/2004
11   Control Compaction  100 Points  At Siem Resp Pronvince (ILO)
3/1994
12   Waste water    
  treatment
 51 Field  densities  Sihanouk ville, Kingdom of  Cambodia
11/2003
13

Development Bridge (Trip)

10 points Kompot province, Kingdom of Cambodia. 01/02
14 Development Bridge (Trip) 15 POINTS Kompong Thom province, Kingdom of Cambodia 01/02
15 Development Bridge (Trip) 10 POINTS Kompong Cham province, Kingdom of Cambodia 02/02
16 Development Bridge (Trip) 12 POINTS Prey Veng province, Kingdom of Cambodia 02/02
17 Development Bridge (Trip) 12 POINTS Kompong Chhnag province, Kingdom of Cambodia 02/02
18 Siem Reap Angkor
International Airport runway, Taxiway, Apron
91 Points Siem Reap Province 11/04
 
     
     
     
     
     
     
       
 
 
         
   
                 
 
     
       © 2005 GSL Testing. All Rights reserved